Update on the Band (Shell) Tarp. The non acoustic 4 posts with a tarp stretched across the top started falling apart before it was finished. Cracks Developed in the Concrete slab. The Steps were not level and needed to be replaced and the tarp was torn and patched. Final cost is unknown but a $350,000.00 price tag is used. It was used for a few events last summer however the promised gathering point for the community is mostly attracting the followers of the particular Band Performing.
The Contractor who is responsible for the shoddy construction and damage is missing in Action.